Two rakes upgraded with CBTC for signalling tests: Metro official
As the second phase of the traffic block in Green Line I and II are in effect till Sunday, two rakes from the existing fleet have been upgraded with the communication-based train control (CBTC) for conducting the tests of the advanced signalling system.