Chinese string menace: KMDA begins fencing Maa Flyover
The step to “fix wires” over both flanks of the Maa Flyover on the most vulnerable 900 metre-long stretch from Topsia crossing to the approach of 4 No. bridge had been taken, said a senior officer of the traffic department at Lalbazar.