PM calls for making meditation part of daily life
He remarked that meditation is a powerful way to bring peace and harmony to one’s life, as well as to society and the planet.
Prime Minister Narendra Modi on Sunday posted a video clip on his X handle in which he shared his memorable moments of Mumbai metro journey.
Prime Minister Narendra Modi on Sunday posted a video clip on his X handle in which he shared his memorable moments of Mumbai metro journey.
In a post on X, Modi said, “Memorable moments from the Mumbai Metro. Here are highlights from yesterday’s metro journey.”
Advertisement
The Prime Minister took the metro ride from BKC to Santacruz station on Saturday during which he interacted with students, women beneficiaries of the Ladki Bahin scheme, workers and other commuters.
Advertisement
On Saturday, the Prime Minister inaugurated the BKC to Aarey JVLR section of Mumbai Metro Line 3 (Colaba-SEEPZ). The project came up at a cost of Rs 14,120 crore.
Nine out of a total of 10 stations on the section will be underground. Mumbai Metro Line 3 is a key public transport project that will improve commuting between Mumbai city and Suburbs. Fully operational line-3 is expected to cater to about 12 lakh passengers daily.
The project has received funding from Japan International Cooperation Agency (JICA).
The 10 stations will be operational from October 6, from 6.30 a.m. to 10.30 p.m. on weekdays and 8.30 a.m. to 10.30 p.m. on weekends.
There will be nine rakes, undertaking 96 trips each day. The Mumbai Metro Rail Corporation Ltd (MMRCL) expects each eight-car train to ferry 2,500 passengers while the headway between two metro trains will be 6.40 minutes.
According to an MMRCL official, 48 train captains will maneuver the trains.
The fares for the Aarey-BKC route will be in the range of Rs 10 to Rs 50. He further said that the maximum fare will be Rs 70 after the entire corridor (Colaba-SEEPZ) is ready till Cuffe Parade.
The phase II of Mumbai Metro Line 3 second phase is 21.34 km long and once it becomes operational, 31 rakes are expected to ferry around 13 lakh passengers daily.
The project aims to cope with the increase of traffic demand in Mumbai by expanding the mass rapid transportation system, thereby promoting regional economic development and improving urban environment, through mitigation of traffic jams and decrease of pollution caused by increasing motor vehicles.
Mumbai Metro Line 3 is the first underground metro section in Mumbai which will connect Cuffe Parade business district in south Mumbai to SEEPZ in the north-central via BKC station and Chhatrapati Shivaji Maharaj International Airport station, with 26 underground stations and one at-grade station.
Advertisement