The Delhi Metro Rail Corporation (DMRC) on Tuesday started its trial runs on the Lajpat Nagar-Sir Vishweshwaraiah Moti Bagh section of the 59-km long Pink Line (Majlis Park-Shiv Vihar corridor).
The 8.10 km stretch between Lajpat Nagar and Sir Vishweshwaraiah Moti Bagh section of the upcoming 59 km long Majlis Park-Shiv Vihar corridor (Line 7) of Phase-III, also known as the Pink Line.
This section from Lajpat Nagar to Sir Vishweshwaraiah Moti Bagh consists of 6 stations (Sir Vishweshwaraih Moti Bagh, Bhikaji Cama Place, Sarojini Nagar, INA, South Extension and Lajpat Nagar). Out of these 6 stations, Only Sir Vishweshwaraiah Moti Bagh station is elevated and rest 5 stations are underground.
A 21.56-km-long segment of the same line — from Majlis Park to Durgabai Deshmukh South Campus — was opened for the public last month.
According to the Metro officials, during these trials, the interface of the Metro train will be checked to ensure that there is no physical infringement with civil infrastructure during the movement of the train on the track and also testing of various subsystems of coaches shall be done.
(with input from agencies